ITPEC FE Morning April 2018 Question 50

Source exam: ITPEC FE Morning April 2018Topic: Software Development

ITPEC FE Morning April 2018 — Question 50 of 80

Forward Engineering — generate design documents (E-R diagrams) from an active database using a modeling tool.

Forward engineering uses existing database definitions (metadata, schema) to automatically produce design documentation such as E-R diagrams.

  • Forward engineering — from model/schema → generate artifacts (docs, code, diagrams)
  • Reverse engineering — from finished product/code → reconstruct the model or documentation

Why not others:
- (a) Concurrent engineering — developing multiple stages in parallel (manufacturing/management concept)

- (c) Reverse engineering — the opposite direction: extracting design from an existing product

- (d) Social engineering — manipulating people to gain confidential information (security attack)

Key rule: Forward = schema/model → output artifacts; Reverse = finished product → recovered design.

AI-generated — may contain errors

The original exam layout is preserved in the image so diagrams, formulas, tables, and code remain accurate.

This question comes from an official ITPEC past paper. ITPEC Practice is an independent study tool and is not affiliated with ITPEC. See the official FE past-paper collection or Report an issue.